1. Home
  2. library
  3. Easy Install Pass-Through System

Flush-Mount System Allows Servicing or Replacement without Cleanroom Shutdown!

passthrough replacement steps
Unique quick-mount system installs in under five minutes, regardless of wall thickness and without contamination
A Inside of flush-mount bracket on opposing side
B Bolt guide extending from nut welded to opposing bracket
C Mounting bolt (one, two or three per side, depending on chamber height) - standard sizes accommodate any wall thicknesses
D Mounting bracket
E Bracket cover
F Standard wall (masonry or drywall)

The simplicity of the flush-mount clamping system makes removal of the pass-through chamber just as easy as installation. If the wall cut-out framing is properly sealed prior to installation, the pass-through can be quickly removed and replaced without ever having to shut down the cleanroom. Maintain the positive-pressure differential and protect the cleanroom environment by sealing off the "dirty side" with plastic sheeting prior to removal. Loosen the lag bolt so that the pass-through lifts out of the wall without contaminating the room. Once out, the pass-through can be serviced, modified, or even replaced with an upgraded version to accommodate new applications.

cleanroom passthrough cleaning
Finish cut-out framing to minimize
contamination exposure during servicing