Resource Library

video

On-Site Hardwall Cleanroom Installation

Video showing installation of a hardwall, modular cleanroom at a customer site. The room is tested at the factory, then shipped overseas to be installed. Framing, paneling and utilities are assembled according to the customer specifications.

video

Installation Test of a Modular Hardwall Cleanroom

Time-lapse video of a multi-chamber modular hardwall cleanroom being erected and tested prior to shipping. The steps cover preparation, framing, panel placement, and A/C return ducting installation.

video

Modular BioSafeĀ® Cleanroom Installation Test

Time-lapse installation of a modular BioSafe steel cleanroom with windows, an exit swing door, entryway airshower and 50% ceiling coverage of fan/filter units.

3 Item(s)

Hide
You need at least 2 products to compare Compare Clear All
Compare Products