CleanMount™ Design Allows Servicing or Replacement without Cleanroom Shutdown!

The simplicity of this CleanMount clamping system makes removal of the pass-through chamber just as easy as installation. If the wall cut-out framing is properly sealed prior to installation, the pass-through can be quickly removed and replaced without ever having to shut down the cleanroom. Maintain the positive-pressure differential and protect the cleanroom environment by sealing off the "dirty side" with plastic sheeting prior to removal. Loosen the lag bolt so that the pass-through lifts out of the wall without contaminating the room. Once out, the pass-through can be serviced, modified, or even replaced with an upgraded version to accommodate new applications.
A - Inside of flush-mount bracket on opposing side
B - Bolt guide extending from nut welded to opposing bracket
C - Mounting bolt (one, two or three per side, depending on chamber height) -
standard sizes accommodate any wall thicknesses D - Mounting bracket
E - Bracket cover
F - Standard wall (masonry or drywall)