Important: Select this option to ensure wall panels and related components will be manufactured and documented in accordance with FM-approved design and certification requirements.
FM Approval helps meet municipal and other building permitting requirements that may be required.
FM Approval ensures safety and integrity of wall, door, and ceiling systems, as evaluated by independent third-party FM.
Ensuring the safety of your personnel, equipment, and facility is essential. FM is recognized around the world as a leader in product safety testing and certification. Terra's FM Approved wall, door, and ceiling systems are manufactured to the highest standards to provide reliable fire safety for your people and facility.
After certification, FM conducts monthly inspections and audits to maintain product quality and ensure ongoing compliance with safety standards for which the products were initially certified.
Includes declaration of listing under FM 4880 and 4882 for Terra wall, door, and ceiling systems.
BioSafe® Wall Panel System
Simplify Cleanroom Construction with BioSafe® Wall Panel System
BioSafe® Wall Panel System cGMP compliant, 304 and 316 stainless steel or pre-coated uPVC steelSimplify Cleanroom Construction with BioSafe® Wall Panel SystemBuild faster and cleaner with Terra Universal’s BioSafe® Wall Panel System. Ideal for ISO Class 4 and cGMP facilities, the seamless monolithic design ensures superior cleanliness and durability.
These modular panels simplify installation, reduce costs, and allow quick reconfiguration.
BioSafe® cleanroom with exhaust plenum and ventilation systemBioSafe Containment CleanroomsBioSafe® cleanroom with exhaust plenum and ventilation system creates negative internal pressure for biohazard containment (shown with A/C units).
21770
Stick-Built Cleanroom for Electronics Assembly
Stick-Built, ISO 6 cleanroom for electronics assembly installed in San Diego, California
Brick-and-mortar, ISO 7 cleanroom for high-throughput packaging of medical devicesMedical Device Packaging CleanroomBrick-and-mortar, ISO 7 cleanroom for high-throughput packaging of medical devices
21773
University Health Lab
Stick-Built cleanroom installed in university health center for patient lab sample processing
Cleanrooms are built quickly and efficiently to minimize disruption of daily operations. They can be adapted into any on-site building environment. Pre-engineering allows for predictability.
Terra's services including HVAC, plumbing, electrical and gas line connections, allowing for streamlined coordination and delivering a functional cleanroom facility.
On a tight schedule?Choose FasTrak 24/7 Priority Service to help meet your critical schedule for Terra-manufactured products, either before or after your order is placed.*
FasTrak 24/7 provides a 24/7 commitment to meet the shipping date YOU specify, regardless of quoted lead times.
FasTrak 24/7 assigns a dedicated production team plus a dedicated senior expeditor working three shifts to meet your delivery specification.
FasTrak 24/7 guarantees* to meet the agreed-to specified ship date.
Call for pricing. FasTrak service fees cover costs of additional services only, without additional profit.
* Terra's FasTrak services limited guarantee: to ship on the ESD or date specified OR to refund up to 100% of FasTrak charges. This guarantee covers no direct, special, consequential or other damages and is strictly limited to up to 100% of the amount paid for FasTrak service. When a specified ship date is missed due to factors outside Terra's control (vendor performance, deliveries by shipping companies, etc.) and random factors such as accidents, the credit of up to 100% of the FasTrak 24/7 may not apply. FasTrak service requested after order placement will be quoted and accepted based on available time remaining before required ship date.